Cardinia Connection Alliance

ThinkSpatial was contracted by John Holland to provide surveying services during the construction of the Cardinia Desalination Pipeline. Construction began in March 2010 and was completed in early 2011.

ThinkSpatial provided a range of surveying services for the project including the establishment and verification of survey control, feature surveys, pipe setout, as-constructed data collection, and the setout of structures such as pump stations, chutes, and outlets. ThinkSpatial is also provided design model management and survey management services to the project.