Channel Remediation Surveys

Over the past three years ThinkSpatial has been contracted by the Northern Victorian Irrigation Renewal Project (NVIRP) and its successor G-MW Connections, to undertake engineering surveys of channels throughout the Goulburn Murray Irrigation District. These surveys have included establishing survey control, feature and detail surveys of channels and channel structures, and the collection of both long and cross sections at various intervals.

In addition to the collection of accurate and timely survey data ThinkSpatial was also required to provide detailed plans, including the production of longitudinal and cross section plans. The final stage of each survey involves the set-out of title boundaries and easements for construction purposes.